This file is available on a Cryptome DVD offered by Cryptome. Donate $25 for a DVD of the Cryptome 10+-years archives of 37,000 files from June 1996 to December 2006 (~3.7 GB). Click Paypal or mail check/MO made out to John Young, 251 West 89th Street, New York, NY 10024. Archives include all files of cryptome.org, cryptome2.org, jya.com, cartome.org, eyeball-series.org and iraq-kill-maim.org. Cryptome offers with the Cryptome DVD an INSCOM DVD of about 18,000 pages of counter-intelligence dossiers declassified by the US Army Information and Security Command, dating from 1945 to 1985. No additional contribution required -- $25 for both. The DVDs will be sent anywhere worldwide without extra cost. | |||
8 December 2006
[Federal Register: December 8, 2006 (Volume 71, Number 236)]
[Notices]
[Page 71156-71157]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr08de06-76]
[[Page 71156]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. PF06-13-000]
Downeast LNG, Inc.; Supplemental Notice of Intent To Prepare an
Environmental Impact Statement for the Downeast LNG Project and Request
for Comments on Environmental Issues Related to the Potential Expansion
of the Maritimes & Northeast Pipeline System
December 1, 2006.
The Federal Energy Regulatory Commission (FERC or Commission) is in
the process of evaluating the Downeast Liquefied Natural Gas (LNG)
Project planned by Downeast LNG, Inc. (Downeast). The project would
consist of an onshore LNG import and storage terminal, located on the
south side of Mill Cove in the Town of Robbinston, near the confluence
of Passamaquoddy Bay and the St. Croix River, in Washington County,
Maine; and an approximately 31-mile-long natural gas sendout pipeline.
The Downeast LNG Project would be designed to have a maximum sendout
capacity of 625 million cubic feet of natural gas per day.
The proposed sendout pipeline operated by Downeast LNG would
transport natural gas from the LNG terminal to an interconnect point
with Maritimes & Northeast Pipeline L.L.C.'s (M&NE) existing pipeline
system near the town of Baileyville, Maine. The M&NE system currently
does not have sufficient capacity to transport the natural gas that
would be supplied by the Downeast pipeline. Therefore, if the Downeast
LNG Project is authorized and placed into service, M&NE's system would
need to be modified or expanded in Maine, New Hampshire, and
Massachusetts.
This Supplemental Notice of Intent (NOI) discloses the potential
facilities that would likely be required to expand M&NE's system, based
on information provided to Downeast by M&NE, and requests comments
regarding the possible environmental impact of those facilities.
Although M&NE is not proposing to construct these facilities and does
not have an application before the FERC, it has been determined that
these expanded M&NE facilities are likely a necessary part of the
project and that an analysis of the impacts of these facilities will be
included in the EIS being prepared for the Downeast LNG facility.
A map depicting the expansion of the M&NE facilities downstream of
the interconnection with Downeast is included in Appendix 1. The
following facilities have been identified by M&NE as necessary to
accommodate the gas volumes to be delivered by Downeast LNG.
Pipeline Looping
Approximately 130.9 miles of 36-inch-diameter pipeline looping
would likely be required within or adjacent to the existing M&NE right-
of-way or other nearby utility or road rights-of-way, as follows:
Eliot Loop--approximately 3.4 miles from Newington in
Rockingham County, New Hampshire to Eliot in York County, Maine;
Westbrook Loop--approximately 16.5 miles from Saco in York
County, Maine to Westbrook in Cumberland County, Maine;
Richmond Loop--approximately 27.6 miles from Pownal in
Cumberland County, Maine to Richmond in Sagadahoc County, Maine;
Searsmont Loop--approximately 19.7 miles from Windsor in
Kennebec County, Maine and Searsmont in Waldo County, Maine;
Brewer Loop--approximately 21.9 miles from Monroe in Waldo
County, Maine to Brewer in Penobscot County, Maine;
Woodchopping Ridge Loop--approximately 22.2 miles from
Greenfield in Penobscot County, Maine to Township T35 MD in Hancock
County, Maine; and
Baileyville Loop--approximately 19.6 miles from Township
T37 MD BPP in Washington County, Maine to the Baileyville Compressor
Station in Washington County, Maine.
The potential pipeline loops would generally be adjacent to the
existing mainline; however, the exact side that the loop would be
located on varies due to numerous crossovers throughout the looping.
Compressor Station Facilities \1\
---------------------------------------------------------------------------
\1\ The Eliot, Westbrook, Searsmont, Brewer, and Woodchopping
Compressor Stations are to be constructed as part of the M&NE Phase
IV Project that is currently being evaluated by FERC and other
cooperating agencies under Docket Number CP06-335-000. This NOI
assumes that the facilities in the Phase IV Project are approved and
constructed prior to the construction of the M&NE expansion
facilities discussed in this NOI.
---------------------------------------------------------------------------
Compression requirements for the pipeline expansion would likely
include adding compression to six existing compressor stations and the
construction of one new compressor station as follows:
Eliot Compressor Station--install a Solar Titan 130
natural gas-driven turbine compressor;
Westbrook Compressor Station--install a Solar Taurus 70
natural gas-driven turbine compressor;
Richmond Compressor Station--install a Solar Mars 100
natural gas driven turbine compressor;
Searsmont Compressor Station--install a Solar Taurus 70
natural gas-driven turbine compressor;
Brewer Compressor Station--install a Solar Taurus 70
natural gas-driven turbine compressor;
Woodchopping Ridge Compressor Station--install a Solar
Taurus 70 natural gas-driven turbine compressor; and
A new compressor station located in the City of Methuen,
Middlesex County, Massachusetts. This facility would involve the
installation of a Solar Taurus 70 natural gas-driven turbine
compressor.
By this notice, the Commission specifically requests comments only
on these additional M&NE facilities. Your input will help identify the
issues that need to be evaluated in the EIS. Comments on the project
should be submitted in written form. Further details on how to submit
written comments are provided in the Public Participation section
below. Please note that comments are due by January 5, 2007.
This NOI is being sent to Federal, State, and local government
agencies; elected officials; environmental and public interest groups;
Indian tribes; and local libraries and newspapers. We encourage them to
comment on their areas of concern.
Public Participation
You can make a difference by providing us with your specific
comments or concerns about the M&NE expansion. By becoming a commentor,
your concerns will be addressed in the EIS and considered by the
Commission. Your comments should focus on the potential environmental
effects, reasonable alternatives (including alternative facility sites
and pipeline routes), and measures to avoid or lessen environmental
impacts. The more specific your comments, the more useful they will be.
To ensure that your comments are timely and properly recorded, please
follow these instructions:
Send an original and two copies of your letter to: Magalie
R. Salas, Secretary, Federal Energy Regulatory Commission, 888 First
St., NE., Room 1A, Washington, DC 20426.
Label one copy of your comments for the attention of OEP/
DG2E/Gas Branch 3.
[[Page 71157]]
Reference Docket No. PF06-13-000 on the original and both
copies.
Mail your comments so that they will be received in
Washington, DC on or before January 5, 2006.
The Commission strongly encourages electronic filing of any
comments in response to this NOI. For information on electronically
filing comments, please see the instructions on the Commission's Web
site at http://www.ferc.gov under the ``e-Filing'' link and the link to
the User's Guide as well as information in 18 CFR 385.2001(a)(1)(iii).
Before you can file comments, you will need to create a free account,
which can be accomplished online.
Once Downeast formally files its application with the Commission,
you may want to become an ``intervenor,'' which is an official party to
the proceeding. Intervenors play a more formal role in the process and
are able to file briefs, appear at hearings, and be heard by the courts
if they choose to appeal the Commission's final ruling. An intervenor
formally participates in a Commission proceeding by filing a request to
intervene. Instructions for becoming an intervenor are included in the
User's Guide under the ``e-filing'' link on the Commission's Web site.
Please note that you may not request intervenor status at this time.
You must wait until a formal application is filed with the Commission.
Environmental Mailing List
If you wish to be added to the Downeast LNG environmental mailing
list, please return the attached Mailing List Retention Form (Appendix
2 of this NOI). Also, indicate on the form your preference for
receiving a paper version of the EIS in lieu of an electronic version
of the EIS on CD-ROM. If you do not return this form, we will not add
your name to our mailing list.
Additional Information
Additional information about the project is available from the
Commission's Office of External Affairs, at 1-866-208-FERC (3372) or on
the FERC Internet Web site (http://www.ferc.gov) using the ``eLibrary
link.'' Click on the eLibrary link, select ``General Search'' and enter
the project docket number excluding the last three digits (i.e., PF06-
13) in the ``Docket Number'' field. Be sure you have selected an
appropriate date range. For assistance with eLibrary, the eLibrary
helpline can be reached at 1-866-208-3676, TTY (202) 502-8659, or by e-
mail at FercOnlineSupport@ferc.gov. The eLibrary link on the FERC
Internet Web site also provides access to the texts of formal documents
issued by the Commission, such as orders, notices, and rulemakings.
In addition, the FERC now offers a free service called
eSubscription that allows you to keep track of all formal issuances and
submittals in specific dockets. This can reduce the amount of time you
spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. To register for this service, go to http://www.ferc.gov/esubscribenow.htm
.
Public meetings or site visits will be posted on the Commission's
calendar located at http://www.ferc.gov/EventCalendar/EventsList.aspx
along with other related information.
Finally, Downeast has established an Internet Web site for this
project at http://www.downeastlng.com/index.htm. The Web site includes
a project overview, status, potential impacts and mitigation, and
answers to frequently asked questions. You can also request additional
information by calling Downeast directly at 207-214-5926.
Magalie R. Salas,
Secretary.
[FR Doc. E6-20816 Filed 12-7-06; 8:45 am]
BILLING CODE 6717-01-P